11 November 2025

10 June 2009

 JOHN

Put plywood on the back room and brought in the shower stall so we can replace the drain.  Went back and fixed the drain and put the shower in the room  What a job!  Had to cut an extra doorway so we could lift it.  Shoved it in place and cut the new hole for the drain.

Now home to fill the tank with water.  Marian had to go into town to get bleach.  Ready to put pine on the walls tomorrow.  Cribbage and bed. 

No comments:

Post a Comment